Laserfiche WebLink
Canyon Dolomite - Old Quarry <br />Final Drainage Report <br />Percent Impervious Calculations and Rational Method "C" Calculations <br />Calculated by: John Jankousky Revision: 5/29/2015 <br />Soil Hydrologic Group D <br />Land Use % Imp. <br />C2 <br />CS <br />C10 <br />C100 <br />Landscape Area' <br />0 <br />0.04 <br />0.15 <br />0.25 <br />0.5 <br />Railroad Yard Area <br />40 <br />0.28 <br />0.35 <br />0.42 <br />0.58 <br />Gravel Street <br />80 <br />0.6 <br />0.63 <br />0.66 <br />0.74 <br />Building/Roof Area <br />90 <br />0.73 <br />0.75 <br />0.77 <br />0.83 <br />Pavement Area <br />100 <br />0.89 <br />0.90 <br />0.92 <br />0.96 <br />For "Landscape Area", assume zero percent impervious (sandy soils) <br />Combined C values are equal to area weighted average, that is. C combined = summation( C , x Area, / total Area <br />For Basins J5 and J6 assume that haul roads and other activities result in some areas of partial imperviousness. <br />Basin J7 is undisturbed except for the access road. <br />Use 80% impervious (Gravel Street) for haul roads and access road. <br />Page A-4 hydrology— Canyor-Dcl mite Rev6May2015 xlsx %mp <br />C <br />n <br />3 <br />v <br />_s <br />m <br />< <br />N <br />L <br />7 <br />—i <br />O <br />d <br />N <br />N <br />? <br />n <br />m <br />_ <br />a <br />- <br />�. <br />- <br />0 <br />3 <br />0 <br />3 <br />a <br />_ <br />N <br />D <br />m <br />D <br />D <br />D <br />D <br />D <br />a <br />`<_ <br />a <br />oa <br />s <br />n <br />3 <br />n <br />m <br />m <br />m <br />m <br />m <br />N <br />N <br />n <br />U1 <br />I O <br />1 <br />Quarry -outlet <br />1,467,897 <br />33.70 <br />1,394,502 <br />0 <br />0 73,395 <br />5.00 <br />0.083 <br />0.188 <br />0.28 <br />For "Landscape Area", assume zero percent impervious (sandy soils) <br />Combined C values are equal to area weighted average, that is. C combined = summation( C , x Area, / total Area <br />For Basins J5 and J6 assume that haul roads and other activities result in some areas of partial imperviousness. <br />Basin J7 is undisturbed except for the access road. <br />Use 80% impervious (Gravel Street) for haul roads and access road. <br />Page A-4 hydrology— Canyor-Dcl mite Rev6May2015 xlsx %mp <br />