Laserfiche WebLink
2.05.4(2)(e) <br />(vii) Soil Testing Plan <br />Immediately prior to seeding, fertilizer will be applied to enhance root <br />development in the range seedings. The actual type and amount of fertilizer <br />applied will be determined by the analysis of random soil samples taken from <br />the surface one foot of redistributed topsoil material. Known plant nutrient <br />requirements will be compared to the soil fertility analyses to determine <br />fertilizer requirements. At a minimum, the soil will be tested for a deficiency of <br />Nitrogen, Phosphorus and Potassium. Soil from the remote drill sites and <br />roads will not be tested. <br />(2)(f) Disposal of Debris, Acid -Forming and Toxic Forming Materials <br />There is no indication that any acid-forming or toxic forming materials will be <br />encountered on site. Refer to Section 2.04.6(a)(iii)(D). Please refer to Section <br />2.05.3(8) for a discussion of the applicant=s plans to handle debris and non - <br />coal waste. <br />If sustained combustion of debris or non -coal waste becomes a problem the <br />applicant will be prepared to react appropriately. Chemical fire extinguishers <br />will be available in the shop warehouse area and on mobile equipment. A <br />water truck will be available to respond to any problem area. Earth moving <br />equipment may be available to smother a fire if necessary. <br />TR -101 2.05-79 06/15 <br />