Laserfiche WebLink
Bowie Resources, LLC <br />Permit No. 96DL103-1 <br />Final Approval Colorado Department of Public Health and Environment <br />Page 3 Air Pollution Control Division <br />8. The applicant shall follow the most current operating and maintenance plan and record keeping <br />format approved by the Division in order to demonstrate compliance on an ongoing basis with the <br />requirements of condition no. 2, 3 and 6 listed above. (Reference: Reg. 3, Part B,IV.B.2) <br />9. A Revised Air Pollutant Emission Notice (APEN) shall be filed: (Reference: Reg. 3, Part A,II.C) <br />a. Annually whenever a significant increase in emissions occurs as follows: <br />For any criteria pollutant: <br />For sources emitting less than 100 tons per year, a change in actual emissions of five <br />tons per year or more, above the level reported on the last APEN submitted; or <br />For sources emitting 100 tons per year or more, a change in actual emissions of five <br />percent or 50 tons per year or more, whichever is less, above the level reported on the <br />last APEN submitted; or <br />For any non-criteria reportable pollutant: <br />If the emissions increase by 50% or five (5) tons per year, whichever is less, above the <br />level reported on the last APEN submitted to the Division. <br />b. Whenever there is a change in the owner or operator of any facility, process, or activity; or <br />• c. Whenever new control equipment is installed, or whenever a different type of control <br />equipment replaces an existing type of control equipment; or <br />d. Whenever a permit limitation must be modified; or <br />e. No later than 30 days before the existing APEN expires. <br />10. Operating Permit (OP) requirements shall apply to this source at any such time that this source <br />becomes major solely by virtue of a relaxation in any permit limitation. Any relaxation that <br />increases the potential to emit above the applicable OP threshold shall require submittal of and <br />issuance of an operating permit, under Regulation 3, Part C. <br />11. Prevention of Significant Deterioration (PSD) requirements shall apply to this source at any such <br />time that this source becomes major solely by virtue of a relaxation in any permit condition. Any <br />relaxation that increases the potential to emit above the applicable PSD threshold will require a full <br />PSD review of the source as though construction had not yet commenced on the source. The <br />source shall not exceed the PSD threshold until a PSD permit is granted. (Reference: Reg.3, Part <br />B, IV.D.3.b.(iv)) <br />r Mot!!-. <br />R K Hancock III R and C. Hea, P. . <br />Permit Reviewer Unit Leader <br />Issued Initial Approval Issued Mardi 19, 1997 <br />initial Approval Modification issued June 4, 1996 <br />Initial Approval Modficalion 21.^.s Ad August 6, 1999 <br />Indial Approval MoWfcalion 3 issued July 10, 2001 <br />. Foal Approve) Moclifloolion 3 isaued.luy 16, 2002 <br />Noma Change: from Bowie Resources urces United cord <br />Modficatiorc syntheil. <br />throughputs and eared emission our add. <br />: aeaskV mg thrughpu fr00 tom per hour we per year. <br />Modification 02 o <br />Modification s3: 4MieasYtg throughput from m S.5.000.000 mm par per year. <br />029/0049/001