My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-03_PERMIT FILE - C1996083
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2015-06-03_PERMIT FILE - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:01:21 PM
Creation date
6/4/2015 1:41:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
6/3/2015
Section_Exhibit Name
Volume III Exhibit 10 Air Pollution Emission Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />Bowie Resources, LLC <br />Permit No. 98DLO726 <br />Issuance 5 <br />b. Whenever there is a change in the owner or operator of any facility, process, or activity; <br />or <br />C. Whenever new control equipment is installed, or whenever a different type of control <br />equipment replaces an existing type of control equipment; or <br />d. Whenever a permit limitation must be modified; or <br />e. No later than 30 days before the existing APEN expires. <br />GENERAL TERMS AND CONDITIONS: <br />14. This permit and any attachments must be retained and made available for inspection upon <br />request. The permit may be reissued to a new owner by the Division as provided in Regulation <br />No. 3, Part B, Section 11.6 upon a request for transfer of ownership and the submittal of a revised <br />APEN and the required fee. <br />15. If this permit specifically states that final approval has been granted, then the remainder of this <br />condition is not applicable. Otherwise, the issuance of this construction permit is considered initial <br />approval and does not provide "final" approval for this activity or operation of this source. Final <br />approval of the permit must be secured from the APCD in writing in accordance with the <br />provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation No. 3, Part B, Section III.G. Final <br />approval cannot be granted until the operation or activity commences and has been verified by <br />the APCD as conforming in all respects with the conditions of the permit. Once self -certification of <br />all points has been reviewed and approved by the Division, it will provide written documentation <br />of such final approval. Details for obtaining final approval to operate are located in the <br />Requirements to Self -Certify for Final Approval section of this permit. The operator shall <br />retain the permit final approval letter issued by the Division after completion of self -certification <br />with the most current construction permit. <br />16. This permit is issued in reliance upon the accuracy and completeness of information supplied by <br />the applicant and is conditioned upon conduct of the activity, or construction, installation and <br />operation of the source, in accordance with this information and with representations made by the <br />applicant or applicant's agents. It is valid only for the equipment and operations or activity <br />specifically identified on the permit. <br />By: <br />Charles N. Pray, P.E.-P.L.S. <br />Permit Engineer <br />By: <br />I <br />GtM•— <br />FOR <br />R K Hancock III, P.E. <br />Construction Permits Unit Supervisor <br />AIRS ID: 029/0049/008 Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.