Laserfiche WebLink
Task # MR142A02 Page 2 of 2 <br /> <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 (AB.AVG.) <br />Material consistency: 1.000 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.800 (FND-RF) <br />Push gradient: 0.903 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 1.095 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br /> <br />Net correction: 0.5909 <br /> <br /> <br />Adjusted unit production: 1,247.09 LCY/hr <br /> <br />1247.09 <br />Adjusted fleet production: LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.203/LCY <br /> <br />0.72 <br />Total job time: Hours <br />Total job cost: $181 <br /> <br /> <br /> <br />