Laserfiche WebLink
<br />COST SUMMARY WORK <br /> <br />Task description: Minor Revision 142 Cost Summary <br /> <br />Permit Action: Minor Revision <br />Site: Colowyo Coal Mine 142 Permit/Job#: C1981019 <br /> <br />PROJECT IDENTIFICATION <br /> <br /> <br />Task #:MR142A00State:ColoradoAbbreviation:None <br /> <br />Date:6/4/2015County:MoffatFilename:C019-MR142A00 <br /> <br />User:JRS <br /> <br />: <br />Agency or organization nameDRMS <br /> <br />TASK LIST (DIRECT COSTS) <br /> <br /> Form Fleet <br />Task <br />Task <br />Hours Cost <br />Description Used Size <br />MR14Regrade Disturbance from Substations DOZER 1 0.51 $128.00 <br />2A01 <br />MR14Replace Topsoil to Disturbance from Substations DOZER 1 0.72 $181.00 <br />2A02 <br />MR14Reseed Disturbance from Substations with Grazing REVEGE 1 1.00 $184.00 <br />2A03 Land Mix <br /> <br />2.23 $493 <br /> SUBTOTALS: <br /> <br /> <br />INDIRECT COSTS <br /> <br />OVERHEAD AND PROFIT: <br /> <br />Liability insurance: 2.02% Total = $9.96 <br />Performance bond: 1.05% Total = $5.18 <br />Job superintendent: 1.12 hrs Total = $83.80 <br />Profit: 10.00% Total = $49.30 <br /> TOTAL O & P = $148.24 <br /> CONTRACT AMOUNT (direct + O & P) = $641.24 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br /> <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 2.00% Total = $12.82 <br />Reclamation management and/or administration: 1.91% $12.25 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br /> <br />TOTAL INDIRECT COST = $173.31 <br /> <br /> <br />TOTAL BOND AMOUNT (direct + indirect) =$666.31 <br /> <br /> <br /> <br />