Laserfiche WebLink
8 Increase the Elk Creek Mine's liability to account for <br />the additional pad and road disturbances within 30 days. <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Date of Issue: June 3, 2015 <br />0 <br />(Signature of Authorized Representative) <br />January 9, 2015 June 30, <br />2015 <br />r <br />[Signature o rvision Director, if extension is beyond 90 days, <br />pursuant to Rule 5.03.2(2)(e)]. The Division's justification for <br />approving the extension beyond 90 days is attached. <br />