Laserfiche WebLink
The as built design for Pond 008 is shown in this section. The pond is meant to fully contain the <br />flow from a 25 year event. It has an 18" emergency spillway pipe in the dam and 2-6" weep hole <br />pipes that lead to this spillway pipe in the dam. The hydrologic calculations and slope stability of <br />the dam are provided in this Attachment. <br />This pond will become a permanent erosion control dam for later use by the landowner <br />Burbridge. <br />The as built maps for the design are given in Map 2.05.3(3)-4-3. <br />Attachment 2.05.3(3)-4-2 <br />