Laserfiche WebLink
Attachment 2.05.3(3)-17 <br />WFC Letter to Retain All Buildings and Structures in Table 2.05.3(3)-4 ........... <br />Attachment 2.05.3(3)-18 <br />NPDES Discharge Permit JUNE 30, 2013 ................................ <br />Attachment 2.05.3(3)-19 <br />Demonstration of Retention for Pond 008 ................................. <br />Attachment 2.05.3(3)-20 <br />Pond 011 As Built (TR -56) ............................................. <br />Attachment 2.05.3(3)-21 <br />Pond 013 As Built JR -56) ............................................. <br />Attachment 2.05.3(3)-22 <br />Pond 015 Design 100YR-24HR, Full Containment .......................... <br />Attachment 2.05.3(3)-23 <br />Seismic Survey (MR -78) ............................................... <br />Attachment 2.05.3(3)-24 <br />Pond 015 -As Built JR -60) ............................................. <br />Attachment 2.05.3(3)-25 <br />Second Park Lateral Relocation Piping (MR -82) ............................ <br />Attachment 2.05.3(3)-26 <br />Trench Drain Design (TR -64) ........................................... <br />Attachment 2.05.3(3)-27 <br />BB Road West of 2700 Road Culvert Calculations (TR -67) .................... <br />MAPS <br />Map 2.05.3(3)-1 Surface Hydrology <br />Map 2.05.3(3)-1-2 Post Mine Surface Hydrology <br />Map 2.05.3(3)-2 Operations Plan Variance to Leave Turn Slot <br />Map 2.05.3(3)-2-1 Pond 007 As -Built <br />Map 2.05.3(3)-2-2 Modified Pond 007 Drainage Area <br />Map 2.05.3(3)-3 Utility Relocation <br />Map 2.05.3(3)-4-1 Pond 008 Drainage Area <br />Map 2.05.3(3)-4-2 Pond 008 As -Built <br />(Revised February 2015) <br />