My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-02_REVISION - M2014045 (8)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2014045
>
2015-06-02_REVISION - M2014045 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:00:28 PM
Creation date
6/4/2015 8:15:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014045
IBM Index Class Name
REVISION
Doc Date
6/2/2015
Doc Name
Responses to 6/2/2015 Comments CN01
From
Braun Environmental, Inc.
To
DRMS
Type & Sequence
CN1
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGN AND CONSTRUCTION REQUIREMENTS FOR ENVIRONMENTAL PROTECTION FACILITIES <br />(7.3.1(3), 7.2.3) <br />As no designated chemicals, toxic or acid-forming materials, or acid waters are currently being <br />used or exposed to the environment, nor are any anticipated to be used or exposed in the near <br />future, there is no reason or any way possible to design any environment protection facilities. <br />However, in the future, if any of the three above items that are supposed to be the basis for an <br />environmental protection plan are found, proper facilities will be constructed. The project <br />currently has no regulatory required diversions, or collection channels or ditches, but should <br />any of these items appear, facilities would be designed to convey the 100 -year 24-hour peak <br />flows. The site currently does have a temporary stormwater catch -basin located on the work <br />surface near the portal (see map). However, this basin (impoundment -pond) is not required <br />from a regulatory perspective and is only in place at the preference of the operator. Its design <br />allows it to contain 100 percent of the 10 -year 24-hour storm event. Although not required for <br />a facility that needs no current environmental protection, the design has been reviewed and <br />approved by the engineer. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.