Laserfiche WebLink
RECEIVED <br />{UN 03 2015 <br />DIVIS10o, Gr Re ;;LAMATION, <br />NERALS <br />MMeWf9pte <br />EW <br />110c Annual Report <br />Page 2 of 3 <br />Permittee Name: <br />Marathon Oil CoTpany <br />Permit Number: <br />M-2007-067 <br />Operation Name: <br />Circle Dot Quarry <br />County: <br />Garfield <br />Annual Fee Due: <br />Pcrmit Acreage: <br />$323.00 <br />9.11 <br />Anniversary Date: <br />Current Bond Amt: <br />June 4, 2015 <br />$20,676.00 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />YES NO <br />YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />Crushing began on 9/14/09 and concluded on <br />4. What was the date of last excavation, processing or hauling activity at the mine? 11/16/09. Last hauling activity was from existing <br />stockpile on 10/30/13. <br />5. Does the mine operate more than 180 days per year? YES NO <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES NO <br />b) approval for INTERMITTENT OPERATION? YES NO <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). 9.11 Acres <br />8. Number of acres that were newly affected during the current report year. 0 <br />9. Number of acres that were reclaimed during the current report year. 0 <br />10. Estimated new acreage to be affected in the next report year. 0 <br />1 l . Estimated acres to be reclaimed in the next report year. 0 <br />12. Total acres in various staees of reclamation sine nermittPrl <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />0 <br />seeded w/ <br />0 <br />w/topsoil <br />0 <br />mulched w/ <br />0 <br />approved mix: <br />replaced: <br />a roved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />0 <br />fertilized w/ <br />0 replacement <br />0 <br />rate (tons/ac): <br />0 <br />a vd fertilizer: <br />de th (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />N/A <br />application <br />N/A <br />application <br />N/A <br />method: <br />method: <br />method: <br />