My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-03_INSPECTION - C1983059 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1983059
>
2015-06-03_INSPECTION - C1983059 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:01:21 PM
Creation date
6/3/2015 2:05:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Inspection
Doc Date
6/3/2015
Doc Name
Inspection Report
From
DRMS
To
Terror Creek LLC
Inspection Date
4/28/2015
Email Name
JRS
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 28, 2015 C-1983-059/Terror Creek Loadout JRS <br />problems noted. <br />- The light -use road on the east side of the loadout, which runs to the railroad tracks, was stable and well <br />maintained. No problems were noted on this road. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />- The operator was in the process of removing the crushing and screening facilities at the time of the inspection. <br />All of the conveyors have basically been removed and the majority of the crushing and screening facility have also <br />been removed. All of the coal stockpiles (including those created by Farnsworth this winter) have been removed <br />from the site. <br />DOCUMENTS RECEIVED: None <br />This concludes the 28 April 2015 aerial inspection for the Terror Creek Loadout. <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.