Laserfiche WebLink
April 28, 2015 C-1983-059/Terror Creek Loadout JRS <br />problems noted. <br />- The light -use road on the east side of the loadout, which runs to the railroad tracks, was stable and well <br />maintained. No problems were noted on this road. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />- The operator was in the process of removing the crushing and screening facilities at the time of the inspection. <br />All of the conveyors have basically been removed and the majority of the crushing and screening facility have also <br />been removed. All of the coal stockpiles (including those created by Farnsworth this winter) have been removed <br />from the site. <br />DOCUMENTS RECEIVED: None <br />This concludes the 28 April 2015 aerial inspection for the Terror Creek Loadout. <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 5 <br />