Laserfiche WebLink
May 26, 2015 C-1983-059/Terror Creek Loadout JRS <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA Not Applicable <br />N - Air Resource Protection <br />N - Roads <br />N - Availability of Records <br />R - Reclamation Success <br />N - Backfill & Grading <br />N - Revegetation <br />N - Excess Spoil and Dev. Waste <br />N - Subsidence <br />N - Explosives <br />N - Slides and Other Damage <br />N - Fish & Wildlife <br />N - Support Facilities On-site <br />N - Hydrologic Balance <br />N - Signs and Markers <br />N - Gen. Compliance With Mine Plan <br />N - Support Facilities Not On-site <br />N - Other <br />N - Special Categories Of Mining <br />N - Processing Waste <br />N - Topsoil <br />COMMENTS <br />This was an aerial inspection of the Terror Creek Loadout conducted by Jim Stark of the Colorado Division of <br />Reclamation, Mining and Safety. Harry Ranney, also with the Division, took the aerial photographs. Since this <br />was an aerial inspection, no company representative was present. The Terror Creek Loadout has basically stopped <br />operating and currently being reclaimed. The weather was sunny and there was some water on the ground from <br />recent rains. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />- The reclamation of the Terror Creek Loadout continues from last month's aerial inspection. The loadout <br />structure and conveyor have been removed. The conveyor is sitting by the old stockpile location. The portable <br />crusher and screener from the Elk Creek Mine (used by Farnsworth) is still sitting in the truck loop. <br />- The large oil tank that was by the fuel island has been removed from the site. <br />- The majority of the control building for the crushing and screening facility has been removed. <br />- The Large warehouse building by the office house has been removed. All that remains is the foundation. <br />DOCUMENTS RECEIVED: None <br />This concludes the 26 May 2015 aerial inspection for the Terror Creek Loadout. <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 2 of 4 <br />