Laserfiche WebLink
Note: In this attachment the irrigation design for the Morgan fields to be replaced as <br />irrigated cropland (IC) in the post -mine condition. All of the Morgan Property will be <br />irrigated as part of reclamation. <br />The TR -65 application proposes to add 2.83 acres of the Morgan property to the NH2 <br />permit area. The area lies on the western end of the permit and is commonly referred to <br />as the BB Detour Road. The currently approved irrigation design is still applicable for the <br />additional 2.83 acres of irrigated cropland (IC). The additional area will be irrigated <br />using the larger of the two center pivots and the big gun sprinklers. <br />December 2014 (TR -65) Attachment 2.05.4(2)(e)-7-2 <br />