My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-16_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2015-03-16_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:24 PM
Creation date
6/3/2015 11:55:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
3/16/2015
Doc Name
Revegetation
Section_Exhibit Name
Section 2.05.4(2)(e) Revegetation
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Xtr- ((a9)X�) <br />r SE, <br />Where: <br />t = calculated t -value <br />Xbr = bond release site (reclaimed site) sample mean <br />Xref = reference area sample mean <br />The null hypothesis being tested is that the mean value for the reclaimed site is less than or <br />equal to Q. If the calculated t value is greater than the table t value (alpha = 0.20, df "), then <br />the null hypothesis is rejected and revegetation is deemed successful for the parameter in <br />question. <br />4.6 Liability Period Management - Reclaimed Irrigated Pastureland <br />Maintenance activities will include the normal monitoring for and repair of excessive rilling or <br />gulling, weed and pest control. The rill and gully management and stabilization plan is detailed <br />after the end of this section. Weed and pest control management will be conducted as <br />necessary and in accordance with the plan described after the end of this section. <br />Irrigation management on irrigated pastureland will follow a similar sequence as irrigated <br />cropland since the source of irrigation water is the same (CCC ditch). This can be seen in <br />subsection 5.7.4. However irrigated pastureland may use a sideroll or may use flood irrigation. <br />4.6.1 Fertilzation Plan <br />Initial fertilization of Reclaimed Irrigated Pastureland soils will take place during topsoil <br />preparation procedures as described in Section 2.05.4(2)(d) subsection 13.2. Beyond the first <br />year of the liability period, nitrogen and phosphorus will be applied to the Reclaimed Irrigated <br />August 2013 PR -08 2.05.4(2)(e) - 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.