My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-16_PERMIT FILE - C1981008A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2015-03-16_PERMIT FILE - C1981008A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:24 PM
Creation date
6/3/2015 11:54:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
3/16/2015
Doc Name
Topsoil Handling, Stockpiling and Redistribution
Section_Exhibit Name
Section 2.05.4(2)(d) Topsoil Handling, Stockpilong and Redistribution
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Topsoil/Subsoil Balance (CY) <br />Mixed Topsoi14 <br />Lift A Topsoils <br />Lift B Topsoil <br />Zone 1 <br />0 <br />5,760 <br />13,988 <br />Zone 2 <br />0 <br />0 <br />0 <br />Zone 2A <br />0 <br />5,327 <br />0 <br />Zone 3 <br />0 <br />6,433 <br />14,582 <br />Zone 4 <br />N/A <br />N/A <br />N/A <br />Soil to be placed <br />0 <br />17,520 <br />28,570 <br />Already Placed' <br />0 <br />0 <br />0 <br />Stockpiled' <br />0 <br />26,552 <br />28,724 <br />Soil Available <br />0 <br />26,552 <br />28,724 <br />Soil Balance' <br />0 <br />1 9,032 <br />154 <br />'From Topsoil/Subsoil Available table. <br />2Combintation of Already Placed and Stockpiled categories. <br />3SoiI Available minus Soil to be placed. This shows that the plan can be accomplished with the soil on site, but it does <br />not mean that there will be soil left over. All soil will be used to reclaim according to this plan.. <br />4Includes the WFC Extra values shown on Map 2.05.4-6 where applicable. <br />'Zone 2A will receive Lift A Topsoil at a depth to be determined by the landowner. The thickness shown in the table <br />above is for calculation purposes only to demonstrate an adequate amount of topsoil is available to reclaim Zone 2A. <br />As can be seen from Table 2.05.4(2)(d)-3, there is sufficient topsoil and subsoil volume in the stockpiles <br />to complete the topsoil redistribution plan. Since stockpiled soil had rock fragments removed during <br />stripping, the recovery from stockpiles is treated as 100%. The basic calculation of the topsoil required in <br />a given zone is: <br />Topsoil Needed = <br />Zone Area (ac) * 43,5606; c * Soil Thickness (in) <br />12 =�t * 27 ft 3 3,ds <br />The size of the stockpiles is determined via detailed surveys conducted on site. All soil thicknesses are <br />designed to the nearest inch, since this is the practical measurement limit for the scale of equipment used <br />at the New Horizon Mine. <br />12.2 North of BB Road/West 2700 Road <br />These lands include all lands north of BB Road and west of 2700 Road except for the 4.76 acres of prime <br />December 2014 (TR -65) 2.05.4(2)(d)-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.