My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-16_PERMIT FILE - C1981008A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2015-03-16_PERMIT FILE - C1981008A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:24 PM
Creation date
6/3/2015 11:54:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
3/16/2015
Doc Name
Topsoil Handling, Stockpiling and Redistribution
Section_Exhibit Name
Section 2.05.4(2)(d) Topsoil Handling, Stockpilong and Redistribution
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 2.05.4(2)(d) <br />Topsoil Handling, Stockpiling and Redistribution <br />Table of Contents <br />1.0 Introduction................................................... 2.05.4(2)(d)-1 <br />2.0 Overburden and Interburden Characteristics .......................... 2.05.4(2)(d)-2 <br />3.0 Acid and Toxic -Forming Materials at New Horizon 2 Mine ............... 2.05.4(2)(d)-2 <br />4.0 Redistributed Soil and Spoil Monitoring Program ...................... 2.05.4(2)(d)-3 <br />5.0 Unsuitable Spoil Mitigation Plan ................................... 2.05.4(2)(d)-7 <br />6.0 New Horizon #2 Mine Spoil Compactibility and Erodibility ................ 2.05.4(2)(d)-8 <br />7.0 New Horizon 2 Mine Topsoil Management Plan General Considerations ... 2.05.4(2)(d)-10 <br />8.0 Topsoil Storage ............................................... 2.05.4(2)(d)-10 <br />8.1 Topsoil Storage Prime Farmland ............................ 2.05.4(2)(d)-13 <br />8.2 Topsoil Storage Non -Prime Farmland Areas ................... 2.05.4(2)(d)-13 <br />9.0 General Topsoil Handling & Placement Procedures Prior to February 2008 <br />...............................................................2.05.4(2)(d)-14 <br />9.1 Morgan Property Soil Augmentation Plan ..................... 2.05.4(2)(d)-14 <br />10.0 General Topsoil Handling & Placement Procedures After February 2008 .. 2.05.4(2)(d)-15 <br />10.1 Mitigation of Friable Rock Deposits ......................... 2.05.4(2)(d)-15 <br />10.2 Subsoil and Topsoil Placement Equipment and Practices ........ 2.05.4(2)(d)-16 <br />11.0 Topsoil Replacement ......................................... 2.05.4(2)(d)-16 <br />August 2013 (PR -08) <br />
The URL can be used to link to this page
Your browser does not support the video tag.