Laserfiche WebLink
Attachment 2.05.3(3) -17 <br />WFC Letter to Retain All Buildings and Structures in Table 2.05.3(3) -4. ......... . <br />Attachment 2.05.3(3) -18 <br />NPDES Discharge Permit JUNE 30, 2013 ................................. <br />Attachment 2.05.3(3) -19 <br />Demonstration of Retention for Pond 008 .................................. <br />Attachment 2.05.3(3) -20 <br />Pond 011 As Built( TR- 56) ............... ............................... <br />Attachment 2.05.3(3) -21 <br />Pond 013 As Built( TR- 56) ............... ............................... <br />Attachment 2.05.3(3) -22 <br />Pond 015 Design 100YR -24HR, Full Containment ........................... <br />Attachment 2.05.3(3) -23 <br />Seismic Survey (MR-78) ................ ............................... <br />Attachment 2.05.3(3) -24 <br />Pond 015 -As Built( TR- 60) .............. ............................... <br />Attachment 2.05.3(3) -25 <br />Trench Drain Design (TR -63) . .......... ............................... . <br />MAPS <br />Map 2.05.3(3) -1 Surface Hydrology <br />Map 2.05.3(3) -1 -2 Post Mine Surface Hydrology <br />Map 2.05.3(3) -2 Operations Plan Variance to Leave Turn Slot <br />Map 2.05.3(3) -2 -1 Pond 007 As -Built <br />Map 2.05.3(3) -2 -2 Modified Pond 007 Drainage Area <br />Map 2.05.3(3) -3 Utility Relocation <br />Map 2.05.3(3) -4 -1 Pond 008 Drainage Area <br />Map 2.05.3(3) -4 -2 Pond 008 As -Built <br />Map 2.05.3(3) -5 -1 Pond 009 As -Built <br />Map 2.05.3(3) -6 -1 Ponds 010 and 013 Layouts <br />Map 2.05.3(3) -8 Mine Roads <br />Map 2.05.3(3) -9 BB Detour Road Plan <br />Map 2.05.3(3) -10 BB Detour Road Profile <br />Revised March 2014 (TR 63) <br />