Laserfiche WebLink
It is my professional opinion that the road meets the design criteria of a minimum static <br />safety factor of 1.3 and is more than adequate for compaction of fills. As shown on Map <br />2.05.3(3) -8, the road is entirely within the disturbed area of the mine and was adjacent to <br />previously mined pits. <br />Based on all the items stated above, it is my opinion as a professional engineer qualified in <br />this field of expertise, that the The Northeast Perimeter Haul Road is adequate for its <br />intended use and basically meets all the requirements of Rule 4.03.1(3). The road is <br />extremely stable and does not result in any damage to the environment of any kind. The road <br />will be reclaimed once mining is completed. Please see details of the reclamation in Section <br />2.05.4. <br />I certify that the information presented in this demonstration is adequate to the best of my <br />knowledge and belief. <br />AE <br />!►Ybe <br />J• <br />20336 <br />ac <br />��ss/ ••E�v `� 610e6 <br />ML <br />(Revised June 2010) 2.05.3(3) -32 <br />