My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-01_REVISION - C1996083 (8)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2015-06-01_REVISION - C1996083 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:01:16 PM
Creation date
6/2/2015 9:16:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
6/1/2015
Doc Name
Federal Mine Plan Modification OSMRE Response
From
OSM
To
DRMS
Type & Sequence
TR100
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/2/2015 State.co.us Executive Branch Mail - Fwd: Bowie No. 2 Mine, C-1996-083, TR -100, Federal Mine Plan Modification OSMRE Response <br />TRI00 is part of the Spruce Stomp lease approved by the ASLlvIM on March 16, 2015. <br />(5) Any change which requires theprepof an environmental impact statement under the National <br />Environmental Polis Act or / 969, 42 U.3. C: 432 / et seq. <br />TR100 was compared to the current EA (DOI-BLM-CO-S050-2013-0010 EA, September <br />2013). The mining method and its environmental effects will not change from those <br />analyzed in the EA. The mining permit issued by the State addresses mitigation of potential <br />adverse environmental effects identified in the EA. If major adverse effects occur, <br />compliance with the permit will identify them and require mitigation. <br />(())Any change in the mining operations and reclamation plan that would result in a change in the ostmining <br />land use where the surface is federally -owned. <br />TR100 proposed no change in the postmining land use. <br />It is OSMRE's determination that TR100 does not require a MPDD. Therefore, a mining <br />plan approval from the ASLMM is not required. OSMRE's decision was based upon <br />consideration of the Federal regulations under 30 CFR 740 and 746 and not the technical <br />aspects of TR100. Should you have any questions please contact me, Nicole Caveny, at <br />(303) 293-5073. <br />Sincerely, <br />Nicole Caveny <br />Environmental Protection Specialist <br />Western Region <br />U.S. Office of Surface Mining/DOI <br />1999 Broad-,vay, Suite 3320 <br />Denver, CO 80202-3050 <br />Work # (303) 293-5078 <br />Fax # (303) 293-5032 <br />Jason Musick <br />Environmental Protection Specialist III <br />https:Hmai l.google.com/mai I/u/0/?ui=2&i k=e29129fcb5&view= pt&search=i nbox&th=14db433e56f276dl &si m l=14db433e56f276dl 314 <br />
The URL can be used to link to this page
Your browser does not support the video tag.