My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-01_REPORT - C1996084
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996084
>
2015-06-01_REPORT - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 2:08:28 PM
Creation date
6/2/2015 7:20:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Report
Doc Date
6/1/2015
Doc Name
1st Quarter 2015 Fill Report (COG-850044)
From
New Elk Coal Company
To
DRMS
Annual Report Year
2015
Report Quarter_Month
1
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
LDS
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION OF EXCESS SPOIL FILL <br />First Quarter 2015 Certification <br />Fill Area No. 8 <br />Date: March 24, 2015 <br />Page: 2 of 2 <br />FILL PLACEMENT <br />Fill Placement has been completed in accordance with the approved plan. No additional fill placement is <br />anticipated. <br />COVER MATERIAL <br />Final fill configuration has been established and topsoil material has been placed on the excess spoil -fill. The area <br />was mulched and seeded in the fourth quarter of 2003. Soil was placed and spreads on the upper most surface of <br />the fill in May of 2004. During the second quarter of 2005, areas disturbed by maintenance of the armored down - <br />drains were seeded using certified weed free straw and the approved rangeland seed mix. The construction access <br />road east of the east down -drain was hand mulched and seeded during August of 2006. <br />STRUCTURAL INTEGRITY <br />The entire excess spoil fill facility was examined for signs of failure and instability such as tension cracks, ground <br />movement, springs and seeps, and standing water. There was no indication of potential instability at time of <br />inspection. <br />DOCUMENTATION AND OTHER OBSERVATIONS <br />Early spring conditions exist with abundant of green and growing vegetation cover on the entire fill area. <br />CERTIFICATION <br />Inspection was conducted by Vince Massarotti, a qualified professional and MSHA certified inspector of earth and <br />rock -fill embankments and impoundments, under the direction of Mr. Charles McGlothin, a Registered <br />Professional Engineer Licensed in the State of Colorado. <br />This is to certify, to the best of my knowledge and belief, that Fill #8 construction and placement, as noted since <br />the previous certification and as determined during this inspection and by discussions with mine personnel, is in <br />accordance with designs as proposed by CTL Thompson in their report dated April 27 and amended July 27, 2001 <br />and as approved by the Division of Minerals and Geology. <br />Vince Massarotti C arles W. McGlothlin <br />Inspector Professional Engineer <br />Inspections completed in compliance with Rule 4.09.1(11)(b) must be submitted to the Division within two weeks of Completion <br />
The URL can be used to link to this page
Your browser does not support the video tag.