Laserfiche WebLink
NPDES ID. No.: Pond 7 <br />EMERGENCY SPILLWAY <br />1. Does it appear that the emergency spillway has discharged water since the last inspection? <br />YES NO X <br />2. Is erosion occurring at any section of the emergency spillway? <br />YES NO X <br />SEDMIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? <br />YES NO X <br />Explain: <br />OTHER OBSERVATIONS <br />Water level has continued to raise due to rain fall from the mine site. The pond still has a_large amount of storage <br />room and does not need to be discharged at this time. However, we have treated the pond with 10 gallons of <br />feculent to enhance the sediment in the pond in preparation for discharging the water. The pond looks to have <br />some sediment that may need to be cleaned out once pond is able to be discharged. The pond is in great working <br />order and needs no other attention at the time of the inspection. <br />HA CERTIFIED IMPOUNt <br />May 27, 2015 <br />DATE <br />MENT INSPECTOR <br />Page 2 of 2 <br />3595 <br />MSHA Id Number <br />