Laserfiche WebLink
grading and gravel pad sediment control. All SAES were stable with no erosion issues. The following SAES were <br />inspected: <br />Water Storage Tank <br />Explosives Storage <br />Haul Road Blisters <br />Radio Tower <br />Rock Dust Tanks <br />Nitrogen Plant 42 <br />Pond DP -1. <br />Rock check at rock dust tank pad. <br />Last Chance Pond. <br />PROCESSING WASTE/COAL MINE WASTE PILES — Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br />Desrado has completely spread and compact the refuse winter stockpile. Both refuse pile RP -2/3/4 and RP -5A <br />were well compacted and were easily driven on with a truck. Grading of the pile allows surface runoff to flow to <br />perimeter ditches before reaching an associated sediment pond. No signs sloughing or slumping was observed and <br />the piles remain stable. <br />TOPSOIL — Rule 4.06 <br />