Laserfiche WebLink
U. S. Department of Labor <br />MAY 2 9 2015 <br />Tate Tatton <br />VP, General Manager <br />Bowie Resources, LLC <br />P.O. Box 1488 <br />Paonia, Colorado 81428 <br />Dear Mr. Talton: <br />Mine Safety and Health Administration <br />P O Box 25367 <br />Denver, Colorado 80225 <br />Coal Mine Safety and Health <br />District 9 <br />RE: Bowie Mine #2 <br />Mine ID No. 05-04591 <br />Gob Pile #1 <br />ID No.1211-CO09-04591-01 <br />Refuse Pile Construction Modification Plan <br />0�N, N r Op 4 <br />O¢P 96P <br />� y <br />2 �dh <br />S TA'Es OF P <br />The construction modification plan dated January 6, 2015, for the referenced coal refuse <br />pile has been reviewed by MSHA personnel and is approved in accordance with <br />30 CFR § 77.215(g). <br />The submitted construction modification plan consists of a cover letter, one figure and <br />an 18 -page Stability Evaluation Gob Pile #1, Bowie No.2 Mine, dated November 21, <br />2014, by Huddleston -Berry Engineering and Testing, LLC. The refuse pile must be <br />maintained in a manner to ensure that drainage is not impeded and water is not <br />impounded. <br />If you have any question regarding this letter, please contact Ron Gehrke at <br />303-231-5587 or Matt Lemons at 303-231-5458. <br />Sincerely, <br />c n(&'7" <br />Russell J. Riley <br />District Manager <br />cc: Ernal Shaw <br />