Laserfiche WebLink
EXHIBIT L <br />RECLAMATION COSTS <br />The operator will utilize in house resources for the reclamation of the disturbed areas. <br />The costs are calculated for one (1) acre of reclaimed area and should be applied to the contributing <br />acres of each individual phase described in the Phasing Map for Future Permitting and Reclamation, <br />Exhibit F.2. <br />Grading' <br />four (4) hours per acre <br />= $400.00 <br />Spread Topsoil <br />two (2) hours per acre <br />= $200.00 <br />Fertilizer <br />200 pounds per acre <br />= $500.00 <br />Seed Mixture <br />20 pounds per acre <br />= $385.00 <br />Mulch <br />two (2) tons per acre <br />= $400.00 <br />Trees <br />six (6) each per acre <br />-Ponderosa Pine Seedling <br />= $ 18.00 <br />-Mountain Juniper Seedling <br />= $ 10.00 <br />-Gambel Oak Seedling <br />= $ 10.00 <br />Total cost per acre <br />= $1,923.00 <br />The on-site grading/spreading of top soil will be done using a D-9 bulldozer. The proposed grading is depicted by <br />the contours shown in the Reclamation Plan Map — Exhibit F.1. See Reclamation Plan — Exhibit E for more details <br />on haul lengths and volumes of material needed for the average grading amounts. <br />RA2000\2089.00 Sprague Quarry\DOCUMENTS\PERMITS\2015 Mining Permit\For Permit Package Submittal\Exhibit L -Reclamation Costs.clocs <br />