Laserfiche WebLink
A <br />B <br />C <br />D <br />E <br />FI <br />1 <br />2 <br />TASK LIST DIRECT COSTS) <br />�I <br />4 <br />NO. <br />T.481K DESC RIPl0OIS <br />FORM <br />FLEET <br />11ASIK <br />DIREC71 <br />E <br />USED <br />SIZE <br />HOUR'E <br />COST <br />6 <br />7 <br />1 <br />ROUGH AND FINISH GRADE ' .03 ACRES -HO 3:' SLOPE <br />NA <br />1 <br />2 <br />8;300.00 <br />8 <br />a <br />APPLY 9 INCH ES OF TOP SOIL -11C 1.03 AC F ES <br />NA <br />1 <br />2 <br />$11100.00 <br />9 <br />3 <br />REVECI. 1.0'1 ACRES <br />NA <br />1 <br />5 <br />$2,E100.CICI <br />1CI <br />4 <br />IIP ROADS ANC PARKING AREAS <br />NA <br />1 <br />5 <br />$700.00 <br />11 <br />E <br />NOB/EEMO9 ONE LOADER <br />NA <br />.1 <br />4 <br />$1500.00 <br />121 <br />1;. <br />14 <br />19 <br />'SIJ 1371OTAtS <br />'18 <br />$3,7100.00 <br />16 <br />-TOTAL DIRECT COS T <br />$3,700.00 <br />.71 <br />'18 <br />INCLUDES INFLATION FACTOR A[7i., USTMENT OF <br />C1.00% <br />.9 <br />20 <br />21 <br />INDIRIECT COSTS <br />$2,500.00 <br />22 <br />23 <br />24 <br />25 <br />T07 AL COS T OR NEW S UNWARY FORM <br />$6,200.00 <br />26 <br />