Laserfiche WebLink
April 8, 2015 C-1982-056/Foidel Creek Mine JLE <br />Animal burrows in barricade chamber embankment Non -coal waste at barricade chamber pad. <br />TOPSOIL — Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />The topsoil piles within the TORT Borehole area were stable and marked. <br />Maintenance Items: <br />-The topsoil stripped from the access road to the 5MN Utility Borehole and the 5MN Utility Borehole pad has <br />been consolidated into five stockpiles. These piles need topsoil identification markers places on them. <br />-Badger holes were observed on the topsoil stockpiles at the Fish Creek Borehole site. These holes will need to be <br />repaired. <br />-The topsoil identification marker on the topsoil pile located at the 16LT borehole site has blown off and will need <br />to be repaired. <br />-The topsoil identification marker on the topsoil pile located adjacent to Pond T has blown off and will need to be <br />repaired. <br />-The clay storage area was observed. The topsoil stockpile marker has blown down and will need to be replaced. <br />DOCUMENTS RECEIVED <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 8 of 9 <br />