Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Topsoil, Pile 3 to N. Portal Area- Pond 13, Flume, Sub St. G (2.5 acres) <br />Site: Roadside Portals Permit Action: MT7 Permit/Job#: C1981041 <br />PROJECT IDENTIFICATION <br />Task #: 105 State: Colorado <br />Date: 5/12/2015 County: Mesa <br />User: ME <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 623G <br />-Dozer: NA <br />Abbreviation: None <br />Filename: C041-105 <br />COSTShift basis: 1 per day_ <br />iption <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraper Work Team Support EaUlpment Maintenance Eauinment <br />Total work team cost/hour: $509.66 <br />MATERIAL QUANTITIES <br />Initial volume: 2,016 CCY <br />Loose volume: 2,268 LCY <br />Source of estimated volume: Exhibits 9A, 9 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$75.81 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$140.00 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$39.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$254.83 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$509.66 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $509.66 <br />MATERIAL QUANTITIES <br />Initial volume: 2,016 CCY <br />Loose volume: 2,268 LCY <br />Source of estimated volume: Exhibits 9A, 9 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,550 lbs/LCY <br />Material description: <br />Earth - Dry packed <br />Rated Payload: <br />55,200 pounds <br />Payload Capacity: <br />21.65 LCY <br />Swell factor: 1.125 <br />51 and 52 <br />Scraper Bowl (volume) Basis <br />Struck Volume: <br />18.00 <br />LCY <br />Heaped Volume: <br />23.00 <br />LCY <br />Average Volume: <br />20.50 <br />LCY <br />Adjusted Capacity: <br />20.50 <br />LCY <br />