Laserfiche WebLink
Primrose, Pale Evening <br />0.50 <br />5.80 <br />$30.65 <br />Greasewood, Black <br />2.00 <br />280.90 <br />$4326 <br />Kochia, Forage (Prostrate) <br />1.00 <br />140.45 <br />$1239 <br />Totals Seed Mix <br />40.40 <br />558.96 <br />$653.71 <br />Application <br />Description <br />Cost /Acre <br />Broadcast seeding [DMG] <br />$261.28 <br />Total Seed Application Cost/Acre <br />$261.28 <br />MULCHING and MISCELLANEOUS <br />Materials <br />Description <br />Units / <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Straw, delivered {MEANS 3125 14.16 12001 <br />2.00 <br />TON <br />$265.00 <br />$530.00 <br />Total Mulch Materials Cost/Acre <br />I <br />I <br />1 <br />1 $530.00 <br />Application <br />Description <br />Cost /Acre <br />Crimping, with tractor {DMG survey data <br />$65.89 <br />Power mulcher (MEANS 32 91 13.16 0250) <br />$86.68 <br />Total Mulch Application Cost/Acre <br />$152.57 <br />NURSERY STOCK PLANTING <br />Common Name <br />No / <br />Acre <br />Type and Size <br />Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br />Cost /Acre <br />Job Hours: <br />9.83 <br />Totals Nursery Stock Cost / Acre <br />1 $0.00 <br />JOB TIME AND COST <br />No. of Acres: 4.4 Cost /Acre: $1,755.20 <br />Estimated Failure Rate: 50% Cost /Acre*: $1,755.20 <br />*Selected Replanting Work Items: I FERTILIZING,TILLING,SEEDING,MU <br />LCHING <br />Initial Job Cost: <br />$7,722.88 <br />Reseeding Job Cost: <br />$3,861.44 <br />Total Job Cost: <br />$11,584 <br />Job Hours: <br />9.83 <br />