Laserfiche WebLink
Primrose, Missouri Evening <br />0.50 <br />2.03 <br />$30.65 <br />Greasewood, Black <br />1.00 <br />140.45 <br />$21.63 <br />Kochia, Forage (Prostrate) <br />0.25 <br />35.11 <br />$310 <br />Totals Seed Mix <br />20.20 <br />243.50 <br />$339.08 <br />Application <br />Description <br />Cost /Acre <br />Drill seeding (DRMS Cost Data) <br />$88.20 <br />Total Seed Application Cost/Acre <br />$88.20 <br />MULCMNG and MISCELLANEOUS <br />Materials <br />Description <br />Units / <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Straw, delivered {MEANS 3125 14.16 1200) <br />2.00 <br />TON <br />$265.00 <br />$530.00 <br />Total Mulch Materials Cost/Acre <br />I <br />I <br />1 <br />1 $530.00 <br />Application <br />Description <br />Cost /Acre <br />Crimping, with tractor {DMG survey data} <br />$65.89 <br />Power mulcher (MEANS 32 91 13.16 0250) <br />$86.68 <br />Total Mulch Application Cost/Acre <br />$152.57 <br />NURSERY STOCK PLANTING <br />Common Name <br />No / <br />Acre <br />Type and Size <br />Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br />Cost /Acre <br />Totals Nursery Stock Cost / Acre <br />$0.00 <br />JOB TIME AND COST <br />No. of Acres: 20.5 Cost /Acre: $1,267.49 <br />Estimated Failure Rate: 50% Cost /Acre*: $1,267.49 <br />*Selected Replanting Work Items: FERTILIZING,TILLING,SEEDING,MU <br />LCHING <br />Initial Job Cost: $25,983.55 <br />Reseeding Job Cost: $12,991.77 <br />Total Job Cost: $38,975 <br />Job Hours: 40.60 <br />