My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-22_REVISION - M2014063 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2014063
>
2015-05-22_REVISION - M2014063 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:54:10 PM
Creation date
5/26/2015 10:22:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014063
IBM Index Class Name
Revision
Doc Date
5/22/2015
Doc Name
TR01 Map Exhibit F Reclamation Plan
From
JSC, Inc.
To
DRMS
Type & Sequence
TR1
Email Name
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POND DETAIL <br />N.T.S. <br />WATER LEVEL <br />18't <br />EXHIBIT F - RECLAMATION PLAN MAP <br />WRC WET PIT <br />IN SECTION 36, T2N, R97W AND SECTION 1, TIN, R97W OF THE 6TH P.M. <br />RIO BLANCO COUNTY, COLORADO <br />COLORADO STA TF Ljj ,' .. <br />0L <br />IN EACH PHASE, MINING SLOPES OF 2:1 WILL BE [ACKFILLED TO 3:1 OR LESS, EDGE OF WATER <br />ANY REMAINING OVERBURDEN WILL BE SPREAD EVNLY OVER THE BOTTOM IOF <br />s, (FORMER PIT) <br />THE PIT. TOPSOIL WILL THEN BE SPREAD TOA 6°DEPTH, IN ALL DISTURBEID s0" <br />AREAS OF EACH PHASE, EXCEPT THOSE AREAS MRE THAN 5 FEET BELOW THE tm�� <br />EXPECTED WATER LEVEL OF THE POND. <br />0 100 200 400 <br />SCALE: 1" = 200' <br />2' CONTOUR INTERVAL <br />REVISED: 5-14-2015 _r" I <br />
The URL can be used to link to this page
Your browser does not support the video tag.