Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. i <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />1) Field Activities: <br />The following activities were observed: Phase 1 and Phase 2 slope grading, placement and compaction <br />of the Phase 1 and Phase 2 Structural Fill materials, placement of SLF mLrial on Phase 1 slopes, <br />installation of Phase 1 Leak Detection systems, pump monitoring at the LSCS riser pipes, secondary <br />underdrain construction, rip rap placement, and remediation of undergrou, d workings. <br />II) Laboratory Activities: <br />Concrete testing, atterberg limits, moisture, laboratory compaction, and <br />continued. <br />The following samples were collected: Phase 1 Soil Liner Fill, 1 SLF-6-R; <br />Phase 2 Underdrain Fill, 2UF-4-R <br />General Project Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held May 6, 2015 (Amec Foster Wt <br />Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling were some of the tasks <br />Projects, Amec Foster Wheeler, and Ames. <br />Deliveries: None <br />CQA Monitor i <br />A/— <br />Submitted by: +/fit` <br />Bobby Redd, EI <br />Project Resident <br />Reviewed by: <br />CC&V Projects --Z/ <br />Reviewed By: <br />Reviewed By: <br />By: <br />analysis laboratory testing <br />, CC&V, Ames) <br />between CC&V <br />Date: Mav 12. 2015 <br />Date: <br />Date: 5/ 312015 <br />Date: -5% 13- <br />