Laserfiche WebLink
-2- <br />10. Primary Mine Entrance Location (report in either Latitude/Longitude OR UTM): <br />Latitude/Longitude: <br />Example: (N) 390 44' 12.98" <br />(W) 104° 59' 3.87" <br />Latitude (N): deg 39 min 59 <br />Longitude (W): deg 104 min 37 <br />OR <br />Example: (N) 39.73691 <br />(W) -104.98449° <br />Latitude (N) _ <br />Longitude(W ) <br />OR <br />Universal Tranverse Mercator (UTM) <br />Example: 201336.3 E NAD27 Zone 13 <br />4398351.2 N <br />sec 11 25 (2 decimal places) <br />sec 18 11 (2 decimal places) <br />(5 decimal places) <br />(5 decimal places) <br />UTM Datum (specify NAD27, NAD83 or WGS 84) Nad 83 <br />Easting <br />Northing <br />Zone 12 <br />11. Primary Future (Post -mining) Land Use (check only <br />one): <br />0 Cropland(CR) <br />0 Pastureland(PL) <br />El General Agriculture(GA) <br />El Rangeland(RL) <br />Forestry(FR) <br />0 Wildlife Habitat(WL) <br />0 Residential(RS) <br />Recreation(RC) <br />0 Industrial/Commercial(IC) <br />Q Developed Water Resources(WR) <br />❑ Solid Waste Disposal(WD) <br />12. Primary Present Land Use <br />(check only one): <br />❑ Cropland(CR) <br />❑ Pastureland(PL) <br />❑ General Agriculture(GA) <br />0 Rangeland(RL) <br />❑ Forestry(FR) <br />❑ Wildlife Habitat(WL) <br />0 Residential(RS) <br />n Recreation(RC) <br />Industrial/Commercial(IC) <br />Developed Water Resources(WR) <br />El Mining(MN) <br />13. Estimated Beeinnine Date of Contract: April 3, 2015 <br />13.1 Estimated completion date of contract: June 1, 2015 <br />