My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-21_REVISION - M2004031
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004031
>
2015-05-21_REVISION - M2004031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:19:15 PM
Creation date
5/22/2015 9:51:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004031
IBM Index Class Name
REVISION
Doc Date
5/21/2015
Doc Name
Request TR04
From
Aggregate Industries
To
DRMS
Type & Sequence
TR4
Email Name
TOD
AJW
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Tyler O'Donnell, Division of Reclamation, Mining and Safety AL <br />May 18, 2015 <br />Page 2 AGGREGATE <br />INDUSTRIES <br />provide maximum drainage and, if necessary, water will be pumped to achieve the initial <br />drainage goal. <br />Dr. Catherine Kraeger-Rovey of Water & Environmental Systems Technology, Inc. has <br />evaluated and made recommendations with regard to water level monitoring. In <br />accordance with Dr. Rovey's recommendations, a copy of which is enclosed, staff gauges <br />will be installed just below the mine road or Fulton Ditch road on AI's property more or <br />less opposite the vicinity of existing monitoring wells MW -2, MW -6, MW -11, and MW - <br />12, which we have not been able to locate. When areas around original monitoring wells <br />have drained sufficiently, existing wells will be located, rehabilitated and used for <br />continued monitoring; or, if unable to locate the original monitoring wells, shallow wells <br />and/or staff gauges will be established as nearly as possible to the original wells. <br />Data gathered during the temporary mitigation period will be evaluated and used to <br />establish drainage controls for the permanent mitigation plan that is required under <br />MLRB Board Order MV -2015-003. The monitoring data gathered during this temporary <br />period will be submitted with the technical revision for the permanent mitigation plan <br />together with the final well/staff gauge locations. <br />If you have any questions or require additional information regarding this technical <br />revision as proposed, please do not hesitate to call me at (970) 396-5252. <br />Very truly yours, <br />J-�, ;&. &Va�, <br />Connie N. Davis <br />Land Advisor <br />Enclosures <br />Cc: Tony Waldron (via e-mail) <br />Timothy J. Flanagan (via e-mail) <br />Catherine Kraeger-Rovey (via e-mail) <br />
The URL can be used to link to this page
Your browser does not support the video tag.