My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-19_HYDROLOGY - M1977526
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977526
>
2015-05-19_HYDROLOGY - M1977526
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:00:29 PM
Creation date
5/21/2015 8:20:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977526
IBM Index Class Name
HYDROLOGY
Doc Date
5/19/2015
Doc Name
Substitute Water Supply Plan - January 1-December 31, 2015
From
DNR Water Resources
To
DRMS
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Branden Effland <br />Worthing SWSP <br />May 13, 2015 <br />Page 4 <br />according to the release schedule and that the claimed amounts match the amounts recorded <br />in Aurora's accounting. <br />13. The name, mailing address, and phone number of the contact person who will be responsible <br />for operation and accounting of this plan must be provided on the accounting forms to the <br />Division Engineer and Water Commissioner. <br />14. The approval of this SWSP does not relieve the Applicant and/or landowner of the requirement <br />to obtain a Water Court decree approving a permanent plan for augmentation or mitigation to <br />ensure the permanent replacement of all depletions, including long-term evaporation losses <br />and lagged depletions after gravel mining operations have ceased. If reclamation of the mine <br />site will produce a permanent water surface exposing groundwater to evaporation, an <br />application for a plan for augmentation must be filed with the Division 1 Water Court at least <br />three (3) years prior to the completion of mining to include, but not be limited to, long-term <br />evaporation losses and lagged depletions. If a lined pond results after reclamation, <br />replacement of lagged depletions shall continue until there is no longer an effect on stream <br />flow. <br />15. This substitute water supply plan may be revoked or modified at any time should it be <br />determined that injury to other water rights has or will occur as a result of this plan. Should <br />this SWSP expire without renewal or be revoked prior to adjudication of a permanent plan for <br />augmentation, all excavation of the product from below the water table and all other use of <br />ground water at the pit must cease immediately. <br />16. In accordance with amendments to Section §25-8-202-(7), C.R.S. and "Senate Bill 89-181 <br />Rules and Regulations" adopted on February 4, 1992, the State Engineer shall determine if <br />this substitute water supply plan is of a quality to meet requirements of use to which the senior <br />appropriation receiving the substitute supply has normally been put. As such, water quality <br />data or analyses may be requested at any time to determine if the requirement of use of the <br />senior appropriator is met. <br />17. The decision of the State Engineer shall have no precedential or evidentiary force, shall not <br />create any presumptions, shift the burden of proof, or serve as a defense in any water court <br />case or any other legal action that may be initiated concerning the SWSP. This decision shall <br />not bind the State Engineer to act in a similar manner in any other applications involving other <br />plans or in any proposed renewal of this plan, and shall not imply concurrence with any <br />findings of fact or conclusions of law contained herein, or with the engineering methodologies <br />used by the Applicant. <br />If you have any questions concerning this approval, please contact Dean Santistevan in Greeley <br />at (970) 352-8712 or Karlyn Armstrong in Denver at (303) 866-3581. <br />Sincerely, <br />4 vll� <br />vk�-) <br />Jeffeatherage, P.E., <br />ief of Water Supply <br />Attachments: Tables 1, 2, 4, and 5 <br />Figure 4 — Final Reclamation Map <br />Aurora Water Lease <br />2015 Augmentation Delivery Schedule <br />Administration Protocol 'Augmentation Plan Accounting, Division One — South Platte River" <br />
The URL can be used to link to this page
Your browser does not support the video tag.