Laserfiche WebLink
CONSTRUCTION CONTRACT <br />THIS CONSTRUCTIONAGREEMENT, herein referred to the "Agreement," and being executed on May 5, <br />2015 by and between Lazy H INC, located at 34449 WCRd10, Keenesburg, Colorado 80643 and <br />Henrylyn Irrigation District, located at 617 Birch St., Hudson, Colorado 80642; <br />Lazy H INC desires to provide Construction services to and Henrylyn Irrigation District desires to <br />obtain said construction services from Lazy H INC. <br />THEREFORE, Lazy H INC shall agree to provide the necessary equipment and expertise to Henrylyn <br />Irrigation District for the purpose of grading and reshaping the embankments of Boot Lake reservoir by <br />excavating the dirt to favorable slope of four -to -one to prevent further erosion. / <br />- - <br />Lazy H Inc Henrylyn <br />Bill Havengar Rod Baur <br />