Laserfiche WebLink
6.4.7 Exhibit G - Water Information <br />(1) The operation will affect groundwater systems, however through execution of <br />the temporary substitute water supply plan, there will not be a net change to <br />tributary groundwater flow to the Big Thompson River. <br />(2) (a) Surface water structures are shown in Exhibit F, Reclamation Plan Map <br />(c) A stormwater management plan has been prepared for the site which <br />identifies BMP's to prevent pollution to surface waters due to stormwater <br />runoff. <br />(3) Currently, the project will consumes approximately 14.84 acre -ft / year due to <br />evaporative loss of 12.8 acres of exposed groundwater. Final reclamation will <br />remove all exposed groundwater through construction of a compacted clay <br />liner <br />(4) The replacement source for all depletions to the Big Thompson River is fully <br />consumable water rights leased from the City of Loveland. <br />(5) The applicant has applied for and received a NPDES Stormwater Discharge <br />Permit. The permit number is COG50466 <br />