Laserfiche WebLink
ACTIVATED <br />CARBON SILO <br />of KIWI • <br />t (TOP k BOTTOM) <br />I <br />I I <br />y}I <br />II(45WI r <br />45 (W OTKI SEO <br />(Typ.._ _ , oTHERs) <br />PLAN <br />LIME SILO <br />PLAN <br />SECTION B—B <br />T. MCHOR BOLT TYPE, SIZE AND LOCATTOH S K NST—ED IN ACCORDANCE WOH THE SED OESIGIT 04— <br />2. BM — ME NOT SHOWN ON THE DMMNCS. ALL EDGE Sub SNNL K UiPEO IN ACCORDANCE WOH ICI <br />3I8-11 AHD NFO,—TOH FRONDED ON Dw.MNG NO. %. KL O1HER BMS Tlai REOUNE ZAPS SHALL HAVE <br />W IENGTNS IN ACCORONR:E WITH ACI ]Ie -I I AS Slgwx ON OPAWRTG H0. %. <br />]. REMOVE Ill E%ISRNG CONCRETE — FRMT PROPOSED FOOTING LOCATNN PER DMECRON FROM THE ENGINEER <br />N THE FIELD. COOPORMTE N E%iSiNG WGUATIN. TOPSOL OEBMS AND OTHER DELETERKKIS 1NTERIAI.S <br />SIMLL K REMOVED FROM THE MFA OF COIISTRLTCOOII. THE FOOTING MFA SHMLD M SCMRTED TO A DEPTH <br />OF B INCHES. REMOVE ANY LDOSE MATFRW. M EXP CUYE'F MUENALS AND KI—E WITH COMPACTED <br />GWVAAAR RLL THE GRAMTION OF THE GRNRAM FRL SH— K SUN.IITTED FOR REVIEW W THE ENGINEER. <br />THE GRAMRIR FILL SFTGRD K COMPACTED TO AT LEAST M PERCENT OF THE NUMM DRY DENSRY PER MITI <br />DIM7. WRH THE MOCM1E COHiEM BEND WIIHN 2 PERCENT OF THE OPRMUY —JE. THE GEOTECMNI— <br />ENGINEER M THE FIELD SHNL NSPECT THE FRML —VATEO MO PREPARED SURFACE P TO I—EMENT OF <br />ANY GRANIHM FEL OR RENFORLNG $IEEE <br />4. THE FOOTING ORENTATIOM ANO LOCATION S K VERIFTFD IN THE FTF1D W THE ENGINEER. <br />S. FOOFNIG CONCRETE SNALL IMVE A 2e -DAY COMPRESSNE STRENGTH (F -C) OF 4.000 M. <br />B. LINE SILO AND ACMATED CARBON SILO TO K CENTERED ON TOP OF THE FOOT— <br />REVIBRJNS I 'INP <br />A/cona-X SILO FOUNDATION DETAILS <br />amec foster wheelerL.E INJECTION SYSTEM <br />IF BOULDER COMTY. C0.0RWD <br />I <br />M <br />y1 <br />`—TEO <br />FAaeoN ao <br />Y <br />(BY OTNE.) <br />Q <br />e <br />Ar, <br />� <br />LlE 9E0 <br />(BY onWu) <br />/6 REBM AT 9' O.C. <br />B' ABME ERTSIING GRADE <br />wz. (EKDL vary <br />I <br />�• <br />I <br />�� J -e. <br />/B RFBM AT '. <br />6' MME F16S1NG 41110E <br />B' O.C. <br />/5 REBM AT <br />aAz.[ <br />SPACED W//e REBM <br />T-0'— T -B• <br />/e REBM AT <br />(FALX WAT) <br />IS• -0' <br />���». <br />�i. �' <br />-\T 3-B• <br />SECTION A -A <br />/5 REBM AT: <br />TB' O.G. <br />1 <br />\,. <br />SPICED WIIB REBAR 10•-0. <br />0! REMR AT <br />(EACH MAT) <br />p,_o, <br />9' O.G. ANE. <br />99 WAY) <br />SECTION B—B <br />T. MCHOR BOLT TYPE, SIZE AND LOCATTOH S K NST—ED IN ACCORDANCE WOH THE SED OESIGIT 04— <br />2. BM — ME NOT SHOWN ON THE DMMNCS. ALL EDGE Sub SNNL K UiPEO IN ACCORDANCE WOH ICI <br />3I8-11 AHD NFO,—TOH FRONDED ON Dw.MNG NO. %. KL O1HER BMS Tlai REOUNE ZAPS SHALL HAVE <br />W IENGTNS IN ACCORONR:E WITH ACI ]Ie -I I AS Slgwx ON OPAWRTG H0. %. <br />]. REMOVE Ill E%ISRNG CONCRETE — FRMT PROPOSED FOOTING LOCATNN PER DMECRON FROM THE ENGINEER <br />N THE FIELD. COOPORMTE N E%iSiNG WGUATIN. TOPSOL OEBMS AND OTHER DELETERKKIS 1NTERIAI.S <br />SIMLL K REMOVED FROM THE MFA OF COIISTRLTCOOII. THE FOOTING MFA SHMLD M SCMRTED TO A DEPTH <br />OF B INCHES. REMOVE ANY LDOSE MATFRW. M EXP CUYE'F MUENALS AND KI—E WITH COMPACTED <br />GWVAAAR RLL THE GRAMTION OF THE GRNRAM FRL SH— K SUN.IITTED FOR REVIEW W THE ENGINEER. <br />THE GRAMRIR FILL SFTGRD K COMPACTED TO AT LEAST M PERCENT OF THE NUMM DRY DENSRY PER MITI <br />DIM7. WRH THE MOCM1E COHiEM BEND WIIHN 2 PERCENT OF THE OPRMUY —JE. THE GEOTECMNI— <br />ENGINEER M THE FIELD SHNL NSPECT THE FRML —VATEO MO PREPARED SURFACE P TO I—EMENT OF <br />ANY GRANIHM FEL OR RENFORLNG $IEEE <br />4. THE FOOTING ORENTATIOM ANO LOCATION S K VERIFTFD IN THE FTF1D W THE ENGINEER. <br />S. FOOFNIG CONCRETE SNALL IMVE A 2e -DAY COMPRESSNE STRENGTH (F -C) OF 4.000 M. <br />B. LINE SILO AND ACMATED CARBON SILO TO K CENTERED ON TOP OF THE FOOT— <br />REVIBRJNS I 'INP <br />A/cona-X SILO FOUNDATION DETAILS <br />amec foster wheelerL.E INJECTION SYSTEM <br />IF BOULDER COMTY. C0.0RWD <br />