Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: � I / <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Al A <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />11. Describe how roads will be reclaimed or returned to their pre -prospecting (or better) condition: <br />