C1996083
IBM Index Class Name
Report
Doc Date
5/18/2015
Doc Name
1st 2015 Gob Pile Report
From
J. E. Stover & Associates, Inc.
To
DRMS
Annual Report Year
2015
Report Quarter_Month
1
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOWIE RESOURCES, LLC <br />Bowie No. 2 Mine <br />Coal Mine Waste Bank Nos. 1, 2, & 3 Inspections - 1st Quarter 2015 <br />On March 18, 2015 a visual inspection of the Bowie No. 2 Mine coal mine waste banks <br />was performed by the undersigned in accordance with Rule 4.10.2. This inspection <br />includes Gob Pile Nos. 1, 2, and 3. Pile No. 1 is considered inactive. Pile no. 2 is <br />located north of Bowie Road. Pile no. 3 is located south of Bowie Road. <br />I, Tamme Bishop, P.E., have a wide variety of experience in the design and construction <br />of earth fill embankments. Nothing was observed during the inspection that would <br />indicate the piles have a potential for failure. No seepage was noted at the toe of pile <br />no.2. Gob Pile #3 had several damp spots at the toe near the center of the pile. It is <br />unclear if the damp spots are from snow melt, or the gob dewatering. The damp spots <br />will be monitored closely during upcoming inspections. The underdrain at gob pile #3 <br />began flowing again in February. Processing of winter stockpiled gob has begun at <br />both gob piles #2 and #3. All organic material and topsoil has been removed ahead of <br />the waste bank founding. The diversion ditches at gob pile #2 were inspected, both <br />lower and upper, and found to be in good condition. The upper and lower diversion <br />ditches at gob pile #3 were inspected, and were in good condition. <br />At gob pile #2, the first bench east of the haul road is covered with soil. The second <br />bench east of the haul road is mostly covered with a subsoil pile. Most of the third and <br />forth benches east of the road are covered with soil. Soil has been placed on most of <br />the second and third benches west of the haul road. <br />The new East Diversion ditch at gob pile #2 was re -located higher up on the hillside in <br />January. It has been inspected in accordance with Rule 4.09.1 (11) and is in compliance <br />with the approved design. <br />Most of the coal mine waste was generated from the preparation plant. Approximately <br />138,614 tons of gob were hauled to the gob pile #3 drying area. Coal mine waste is to <br />be placed in the piles in approximately horizontal lifts no more than 24 -inches thick. <br />The coal mine waste is dried and then spread and compacted by self propelled <br />sheepsfoot compactors. Thirty four (34) compaction tests were performed during the <br />quarter. Nineteen (19) at gob pile #2 and fourteen (14) at gob pile #3. All of the tests <br />met specifications. A test meets specifications if the test attains at least 90% of the <br />maximum dry density attained in a laboratory compaction test in accordance with ASTM <br />D698. There are no outstanding density test failures at the end of the fourth quarter. <br />The top of gob pile #2 serves as a drying area for end dumped gob. Gob is to be <br />stacked to a maximum height of 20 feet, with a slope angle up to 1.5h -1v. A 25 foot <br />buffer zone on the face of the gob pile will be maintained at all times. Gob will be <br />spread and compacted to the currently approved slope configuration as soon as gob <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.