Laserfiche WebLink
ATTACHMENT A <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. I, <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Amec Foster Wheeler - 2015 CQA Field Staff Schedule MLE2 <br />Name <br />Sun Mon <br />Apr 12 A r13 <br />Tues <br />Apr 14 <br />Wed <br />Apr 15 <br />Thurs <br />Apr 16 <br />Fri <br />Apr 17 <br />Sat <br />A r18 <br />Mike Moore <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />Eric Lorenson <br />ST <br />ST <br />ST <br />ST <br />Ben Melly <br />ST <br />ST <br />ST <br />ST <br />Robert Redd <br />UG <br />UG <br />UG <br />UG <br />UG <br />UG <br />Tyler Browning <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Rex Harrison <br />WI <br />WI <br />WI <br />WI <br />WI <br />WI <br />Rick Buxton <br />ST/WI <br />ST/WI <br />Razi Molloy <br />LT <br />LT <br />LT <br />LT <br />LT <br />Nick Anderson <br />ST <br />ST <br />ST <br />ST <br />ST <br />Shawn Wisely <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Philemon On an o <br />GL <br />GL <br />GL <br />GL <br />GL <br />Andrea Meduna <br />PM <br />Chad Schreiner <br />ST <br />ST <br />ST <br />ST <br />Brett B ler <br />PE <br />LEGEND: <br />UM = Unit Manager <br />PM = Project Manager <br />PCE = Project Certifying Engineer <br />PE = Project Engineer <br />PR = Project Resident <br />LG = Lead Geosynthetics Engineer <br />LS = Lead Soils Technician <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GL = Geosynthetics Lead <br />GT = Geosynthetics Technician <br />FLM= Field/Laboratory Manager <br />UG = Underground Working Remediation <br />SE = Senior Engineer <br />GS = Geophysics Survey Geologist <br />HY = Highway Design Engineer <br />WI = Welding Inspector <br />