My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-13_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-05-13_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:00:16 PM
Creation date
5/15/2015 8:49:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
5/13/2015
Doc Name
CQA Report - weeks ending 4/25/15 and 5/2/15
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec A <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />1) Field Activities: <br />The following activities were observed: Phase 1 and Phase 2 slope grading, placement and compaction <br />of the Phase 1 and Phase 2 Structural Fill materials, placement of SLF material on Phase 1 slopes, <br />placement of DCF material on Phase 1 liner, installation of Phase 1 Leak Detection systems, pump <br />monitoring at the LVSCS riser pipes, secondary underdrain construction, and remediation of Underground <br />Workings. <br />II) Laboratory Activities: <br />Atterberg limits, moisture, laboratory compaction, and sieve analysis laboratory testing continued. <br />General Proiect Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held April 29, 2015 (Amec Foster Wheeler, CC&V, Ames) <br />Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling were some of the tasks occurring between CC&V <br />Projects, Amec Foster Wheeler, and Ames. <br />Deliveries: None <br />CQA Monitor <br />Submitted by: <br />Bobby Redd, EI <br />Project Resident <br />Reviewed by:, F�1_— <br />CC&V Projects <br />Reviewed By: <br />Reviewed By: <br />Date: May 6, 2015 <br />Date: <br />Date: S4 //S <br />Date: i� _,Ij— <br />
The URL can be used to link to this page
Your browser does not support the video tag.