Laserfiche WebLink
Table No. 2 <br />R.M. Hiner Construction Co., Inc. Applegate <br />Greeley Pit (M-1977-151) Group, Inc. <br />Moisture Content of Product = 4% by weight <br />Water Used for Dust Control = 1.0 acre-foot per year <br />Sand & Gravel Specific Weight = 125 lb/ft' (http://www,reade.com/Particle_Briefings/spec_gra2.html) <br />Sand & Gravel Porosity = 45% (estimated by operator) <br />Operational Consumptive Use (aka Operation CU) <br />From Mining <br />Date Revised: 3/20/2015 <br />AG Job #: 09-131 <br />Month <br />Monthly <br />Production <br />[tons] <br />(A) <br />Water Retained <br />in Product <br />[ac -ft] <br />(B) <br />Intermittent <br />Fill Volume <br />[ac -ft] <br />(C) <br />Water Used <br />for Dust Control <br />[ac -ft] <br />(D) <br />Operation <br />CU <br />[ac -ft] <br />(E) <br />Apr -15 <br />0 <br />0.00 <br />0.00 <br />0.10 <br />0.10 <br />May -15 <br />0 <br />0.00 <br />0.00 <br />0.15 <br />0.15 <br />Jun -15 <br />0 <br />0.00 <br />0.00 <br />0.20 <br />0.20 <br />Jul -15 <br />0 <br />0.00 <br />0.00 <br />0.25 <br />0.25 <br />Aug -15 <br />0 <br />0.00 <br />0.00 <br />0.20 <br />0.20 <br />Sep -15 <br />0 <br />0.00 <br />0.00 <br />0.10 <br />0.10 <br />Oct -15 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Nov -15 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Dec -15 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Jan -16 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Feb -16 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Mar -16 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Total <br />0 <br />0.00 <br />0.00 <br />1.00 <br />1.00 <br />Notes: <br />(A) Estimated monthly production volumes provided by operator <br />(B) Water Retained in Product = [(Moisture Content of Product) * (A) * 2000] / (62.4 * 43560) <br />(C) Intermittent Fill Volume = (Volume of Mined Material) x (1 - Porosity) - (B). Mine material volume estimated using specific weight of material. <br />(D) Water Used for Dust Control is estimated to be 1 acre-foot per year and is distributed according to monthly production volumes <br />(E) Operation CU = (B) + (C) + (D) <br />N:\09131 Rex Hiner-Greelev Pit SWSP\Disciplines (TPchnlcaIAWRPM\Watar Rights\SWSP\7015 iWSP\GrPPlPv Pit ?nl r, r%A/CP YkY <br />