Laserfiche WebLink
-4- <br />12. Primary future (Post -mining) land use (check one): <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />_ Residential(RS) Recreation(RC) <br />4� Developed Water Resources(WR) <br />13. Primary present land use (check one): <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />E Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Cormnercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Front end loaders remove material and load into trucks for hauling to processing plant. <br />15, On Site Processing: ✓ Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): Limited if found to be feasible or material will be removed <br />rind qtnckpiled ns nit run and ma yid to n another mine felt nror2CCinq <br />List any designated chemicals or acid -producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />This amendment adds 15.36 acres to the permit area. The mining methods do not change. The final end use is <br />changed to developed water storage with possible residential and other uses. <br />