Laserfiche WebLink
a. Raw 15 -minute gage height readings (presented to the hundredth <br />position). <br />b. Any corrections greater than 10.02 feet made to the raw gage height <br />readings. <br />I. f=ootnotes shall be provided in the accounting for each structure <br />noting when a correction was made, why the correction was <br />made, person making the correction, date correction was <br />physically made and how the correction was applied. <br />c. Calculated discharge plus or minus any applicable gage height correction <br />in cfs. <br />d. Day average discharge through the structure in cfs. <br />e. Splits of delivered waters (if more than one owner is delivering water <br />through the structure). <br />6. Additional items that need to be readily available to the Water Commissioner <br />either through notice of intent to use the structure or via submitted accounting: <br />a. Date the measuring structure was approved by the Water Commissioner. <br />b. Rating table, as approved by the Water Commissioner. A laminated copy <br />of the rating table shall also be available and be kept with the tabular log <br />of corrections as discussed above. <br />c. Type of recorder used to collect gage height data. <br />d. Potential creditors for water splits (the owner of the structure is <br />responsible for splitting the water). <br />e. Contact information for responsible party should there be issues with the <br />structure's operation or performance. <br />Aug Station Protocol <br />Effective May 12, 2011 <br />