My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-12_HYDROLOGY - M2003091
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2003091
>
2015-05-12_HYDROLOGY - M2003091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:00:12 PM
Creation date
5/13/2015 2:46:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003091
IBM Index Class Name
HYDROLOGY
Doc Date
5/12/2015
Doc Name
Substitute Water Supply Plan - August 1, 2014 though July 31, 2015
From
DNR Water Resources
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3 -Revised 8/27/20/4 <br />Marlin Marietta Materials <br />Duckworth Pit <br />2014-2015 SwSI' Combined Total Lagged Depletions and Replacements <br />Depletions I Rural Ditch I Replacement Reaunement I Replacements <br />Notes: <br />(1) Rased upon Tattle 1 <br />(2) Based upon Table t. <br />(3) Credit/depiction from dewwalering is used upon Table 2. <br />(4) Equal to(1)+(2)+(3) <br />(5) Return flow obligations for deliveries of Rural Ditch shafts to Hcalon Rcwlvou. In 2014 it Is expected that a total of 53 5 ac -fl of Rural Ditch eater will be delivered to Heaton Raerw on <br />(6) Historic consumptive a use credits associated .with MMM's twwo Rural Ditch shares These values represent the average monthly HCU volumes based on the November 12, 2010 report completed by Bishop - <br />Brogden Associates These credits are available for storage in healon Reservoir or to be bypassed at the proposed Rural Ditch I ieadgate to replace depletiow. <br />(7) Equal to percent of the month in which "1'rcc Rover" ttas In effect. <br />(8) Equal to((4)+(5)+(6))•(1-(7)) <br />(9) Water pumped from storage in I(caton Reservoir <br />(10) Excess augmentation credits from the South Platte Combined SWSP (excess Aurora Lease µaler unless otherwise noted) exchanged up to the point of the Duckworth dcplclmns on Boulder Creek per approval <br />of the water commissioner <br />(11) Equal to (9) + (10) <br />(12) Equal to(11)+(8) <br />r <br />BBA <br />«f-, r. ISU01'%t nil G 0 INA Vlt)CrATFS (NC <br />(1) <br />(2) <br />(3) <br />(4) <br />(5) <br />(6) <br />(7) <br />(8) <br />(9) <br />(10) <br />(11) <br />(1 2l <br />Rural Ditch <br />Depletions and <br />Credits/ <br />Creditimptelion <br />Ilistoric <br />Return Flow <br />Pumped <br />Excess Credit <br />Lagged Net <br />Lagged <br />from De -Watering <br />Rural Ditch <br />Consumptive <br />Percent of <br />Obligations <br />From <br />from South <br />Evaporation <br />Production <br />Operations at <br />Total Lagged <br />Return Flow <br />Use Credit <br />Month Free <br />Requiring <br />Heaton <br />Platte Combined <br />Total <br />Net Efftcl <br />Depictions <br />Depletions <br />Duckworth <br />Depictions <br />Obligations <br />Bypassed <br />River <br />Replacement <br />Reservoir <br />SWSP <br />Rtplacemenls <br />to the River <br />(ac -fl) <br />(ac -fl) <br />(ac -fl) <br />(ac -fl) <br />(ac -fl) <br />(ac -ft) <br />(%) <br />(ac -fl) <br />(ac -fl) <br />(ac -fl) <br />(ac -ft) <br />(ac -fl) <br />Aug -14 <br />-006 <br />-061 <br />000 <br />-068 <br />000 <br />000 <br />0°/. <br />-068 <br />068 <br />000 <br />0.68 <br />0.00 <br />Sep -14 <br />-007 <br />-0.70 <br />0.00 <br />-077 <br />000 <br />000 <br />0e/. <br />-0.77 <br />0.77 <br />000 <br />0.77 <br />0.00 <br />Oct -14 <br />4) 08 <br />-076 <br />000 <br />-084 <br />-006 <br />000 <br />0% <br />490 <br />090 <br />0.00 <br />0.90 <br />0.00 <br />Nov -14 <br />-009 <br />-090 <br />000 <br />-089 <br />-096 <br />000 <br />0% <br />-174 <br />174 <br />000 <br />1.74 <br />0.00 <br />Dec -14 <br />-008 <br />-083 <br />0.00 <br />-0.91 <br />-059 <br />000 <br />0°/. <br />-150 <br />1.50 <br />0.00 <br />1.50 <br />0.00 <br />Jan -!5 <br />-008 <br />-083 <br />000 <br />-0.91 <br />-043 <br />000 <br />0°/. <br />-134 <br />1.34 <br />000 <br />1.34 <br />0.00 <br />Feb -15 <br />-008 <br />-081 <br />0.00 <br />-089 <br />-0.70 <br />000 <br />0% <br />-1.58 <br />1.58 <br />000 <br />1.58 <br />0.00 <br />Mar -15 <br />-008 <br />-0.77 <br />0.00 <br />-085 <br />-054 <br />000 <br />0°/. <br />-1.38 <br />1.38 <br />0.00 <br />1.38 <br />0.00 <br />Apr -15 <br />-007 <br />-074 <br />000 <br />-082 <br />-0.21 <br />000 <br />0°/. <br />-103 <br />103 <br />000 <br />1.03 <br />0.00 <br />May -15 <br />-007 <br />-075 <br />000 <br />-0.82 <br />000 <br />000 <br />0% <br />-0.82 <br />0.92 <br />0.00 <br />0.82 <br />0.00 <br />Jun -15 <br />-007 <br />475 <br />000 <br />-0.82 <br />000 <br />0.00 <br />0% <br />-0.82 <br />082 <br />0.00 <br />0.82 <br />0.00 <br />Jul -15 <br />-007 <br />-074 <br />000 <br />-090 <br />000 <br />000 <br />0% <br />-090 <br />080 <br />000 <br />0.80 <br />0.00 <br />Annual Taal <br />-091 <br />1 -909 <br />1 000 <br />-1000 <br />-339 <br />000 <br />-1339 <br />1338 <br />000 <br />13.39 <br />0.00 <br />Notes: <br />(1) Rased upon Tattle 1 <br />(2) Based upon Table t. <br />(3) Credit/depiction from dewwalering is used upon Table 2. <br />(4) Equal to(1)+(2)+(3) <br />(5) Return flow obligations for deliveries of Rural Ditch shafts to Hcalon Rcwlvou. In 2014 it Is expected that a total of 53 5 ac -fl of Rural Ditch eater will be delivered to Heaton Raerw on <br />(6) Historic consumptive a use credits associated .with MMM's twwo Rural Ditch shares These values represent the average monthly HCU volumes based on the November 12, 2010 report completed by Bishop - <br />Brogden Associates These credits are available for storage in healon Reservoir or to be bypassed at the proposed Rural Ditch I ieadgate to replace depletiow. <br />(7) Equal to percent of the month in which "1'rcc Rover" ttas In effect. <br />(8) Equal to((4)+(5)+(6))•(1-(7)) <br />(9) Water pumped from storage in I(caton Reservoir <br />(10) Excess augmentation credits from the South Platte Combined SWSP (excess Aurora Lease µaler unless otherwise noted) exchanged up to the point of the Duckworth dcplclmns on Boulder Creek per approval <br />of the water commissioner <br />(11) Equal to (9) + (10) <br />(12) Equal to(11)+(8) <br />r <br />BBA <br />«f-, r. ISU01'%t nil G 0 INA Vlt)CrATFS (NC <br />
The URL can be used to link to this page
Your browser does not support the video tag.