Laserfiche WebLink
i <br />-6- <br />�� • 2. The Board may suspend or revoke this permit, or assess a civil penalty, upon a finding that the permittee <br />violated the terms or canditions of this permit, the Act, the Mineral Rules and Regulations, or that information <br />contained in the application or your permit misrepresei nt important material facts; <br />3. If your mining and reclamation operations affect areas beyond the boundaries of an approved permit <br />boundary, substantial civil penalties, to you as permittee can result; <br />.L 4. Any modifical <br />application requires <br />_ 5. It is your resp( <br />r•4 6. Upon permit issu, <br />the mine site, which sh <br />a. the name of <br />b. a statement <br />Reclamatior <br />C. the permit n <br />/" •l 7. The boundaries o; <br />visible and adequate to <br />•L 8. It is a provision <br />conditions listed in you <br />and Regulations in effe <br />�' • 9. Annually, on the <br />and an annual report w <br />there are changes frorr <br />annually on the anniver <br />example, a permit with <br />June 30, 1995. Failure <br />penalty, revocation of <br />permittee, to continue t, <br />responsibility. <br />NA 10. For joint venture/ <br />power of attorney (pro <br />application. <br />i <br />o the approved mining and reclamation plan from those described in your approved <br />to submit a permit modification and obtain approval from the Board or Office; <br />ility to notify the Office of any changes in your address or phone number; <br />ce and prior to beginning on-site mining activity, you must post a sign at the entrance of <br />1 be clearly visible from the access road, with the following information (Rule 3.1.12): <br />ie operator; j <br />a reclamation permit for the operation has been issued by the Colorado Mined Land <br />ird; and, <br />mber. <br />the permit boundary area must be marked by monuments or other markers that are clearly <br />lelineate such boundaries prior to site disturbance. <br />1 <br />f this permit that the operations will be conducted in accordance with the terms and <br />application, as well as with the provisions of the Act and the Construction Material Rules <br />:t at the time the permit is issued. <br />iniversary date of permit issuance, you must submit an annual fee as specified by Statute, <br />rich includes a map describing the acreage affected and the acreage reclaimed to date (if <br />the previous year), any monitoring required by the Reclamation Plan to be submitted <br />ary date of the permit approval. Annual fees are for the previous year a permit is held. For <br />he anniversary date of July 1, 1,995, the annual fee is for the period of July 1, 1994 through <br />to submit your annual fee and ;report by the permit anniversary date may result in a civil <br />,our permit, and forfeiture of 'your financial warranty. It is your responsibility, as the <br />pay your annual fee to the Office until the Board releases you from your total reclamation <br />I <br />I <br />artnership operators: the signing representative is authorized to sign this document and a <br />ided by the partner(s)) authorizing the signature of the representative is attached to this <br />