Laserfiche WebLink
Mr. Peter Hays <br />TR -26 — TSF Liner System <br />April 29, 2015 <br />excavating activities to not threaten the integrity of the liner. Once the liner is installed, following the <br />preceding steps, the risk of seepage into the permeable sand layer will be minimized. <br />A check in the amount of $1,006.00 is included with this submittal to cover fees for this Technical <br />Revision. If you have any comments, questions or concerns regarding this project, please contact me at <br />720 - 942 -3518 or Miguel Hamarat at 720 - 942 -3255. <br />Sincerely, l <br />Tim Haynes <br />Senior Environmental Engineer <br />Climax Molybdenum Company <br />Henderson Operations <br />Attachments: <br />1. Henderson Mill Sand Seam Mitigation Construction Drawings, Sheets 1 -12 <br />2. Check # 0000816857 in the amount of $1,006.00 <br />cc (via email): <br />M. Hamarat, Climax <br />A. Parmet, Climax <br />File <br />