Laserfiche WebLink
G <br />i <br />a r <br />to <br />PROPOSED <br />ACCESS ROAD <br />TYPICAL RECLAMATION SECTION MU PS <br />i <br />SWMPPP PHASE 0 <br />REMOVE ALL STRUCTURES BOUNDARY <br />1 1 <br />6115 ' <br />MU I PS <br />LEGEND <br />♦�.,. ROCK <br />PLACED CHECK DAM, KEYED, 20' MIN LENGTH <br />DROP ALONG CONSTRUCTED FLOWUNE (TYP) <br />LEVEL y� ♦ ♦ ♦ ♦ ♦� <br />q�� ♦!y ► ♦ ♦A SPREADER, ®r <br />CED �w/ PERMANENT SEEDING <br />MULCHING <br />♦♦ ♦ ♦♦ i�i� ♦9♦ ♦� <br />♦i �i1D♦♦ ♦abA ♦ ♦ ♦il 4 ♦♦ <br />,.9r►c. ♦v♦♦ ♦i�•�a��. .soya rr DIVERSION DIKE <br />11 _) CONSTRUCTED FLOWUNE <br />FLOW DIRECTION <br />►_. II�AI�l�lO ♦�1�1► ♦�w�� �! ♦!♦ !'!�! ♦� ♦!i ♦ ♦!O! ♦!t! ♦! ♦�i !� ♦ ►i v���' �Ii <br />!i!'rAj♦"I'll" <br />♦ b♦ ♦ ♦� ♦����� ♦��� ♦�w� ♦�f� ♦� ♦� ♦� ♦��♦ ♦�♦� ♦��� ♦�o� ♦w� ♦bay° ♦jsd �I <br />C�D PERMANENT SEEDING (OPERATIONS AREA) <br />MULCHING (OPERATIONS AREA) <br />�Ii ♦ ♦♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦�♦� �� ♦♦ <br />s� <br />1� <br />i <br />11 �� <br />1.1. $RECLAMATION TO RANGELAND WILL OCCUR <br />CONCURRENTLY TI <br />2. ASTOPSOIL AND OVERBURDEN CA E REMOVED FROM <br />ACTIVE MINING AREAS, THEY WILL BE PLACED ON <br />SLOPES AND PIT FLOORS OF PREVIOUS MINED PHASES. <br />3. TOPSOIL AND OVERBURDEN NOT IMMEDIATELY USED <br />FOR RECLAMATION WILL BE STOCKPILED ALONG THE <br />HAUL ROAD WITHIN THE MINING AREA <br />4. DURING RECLAMATION, RESEEDED AREAS WILL BE <br />MONITORED FOR NOXIOUS WEEDS AND APPROPRIATE <br />METHODS TO MANAGE WEED GROWTH WILL BE <br />IMPLEMENTED. <br />DWG. NO. REFERENCE DRANINGS REV BY DATE REVISION CONTR' %' DATE CUENT CUENT DATE <br />CHECKED APPR ECK APPRVD <br />x — + ttoo n <br />CROSSFIRE -BONDS PIT <br />FINAL STABILIZATION PLAN <br />200 0 200 400 600 STORMWATER POLLUTION PREVENTION PLAN <br />1199 MAIN AVE. /24/15 200 <br />SCALE IN FEET DURANGO. CO 81301 . . <br />(970) 828 -4732 ow. MJW 7 F BONDS PIT <br />