My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-04_REVISION - C1981008
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2015-05-04_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:58 PM
Creation date
5/5/2015 7:14:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
5/4/2015
Doc Name
Letter & Application
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
MR93
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 17, 2015 <br />Slash M LLC (Morgans) <br />P O Box 346 <br />Nucla, Colorado 81424 <br />Mr. Daniel Hernandez <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Main: 303 - 866 -3567 <br />Fax: 303 - 832 -8106 <br />Re:Request No Topsoil Spreading by Pond 011 & Stockpile BB Detour Road Bench 1 by Pond 011 <br />Dear Mr. Hernandez: <br />Slash M LLC (Morgans) are requesting the north —300 feet of BB Detour Road not be reclaimed <br />until the adjacent Pond 011 is reclaimed. As you know the New horizon 2 Mine has nearly . <br />completed reclamation of our (Morgan) property except for Pond 011 and the BB Detour Road. <br />The reclamation plan for BB Detour Road is to remove the road base and place topsoil on the <br />area as directed by us (landowner): The low area of BB Detour Road southwest and west of <br />Pond 011 needs topsoil to match the grade of the area south of Pond 011 and what will be the <br />reclaimed surface of Pond 011. 'The reclaimed BB Detour Road will be tilled and irrigated like <br />the rest of the reclaimed area. <br />Since the irrigation and tilling of the 60 feet wide and 300 feet long area of.the reclaimed BB <br />Detour Road on the west side of Pond 011 is a logistics problem, we propose not reclaiming this <br />half acre area until Pond 011 is reclaimed (road base will be removed and wattles will provide <br />sediment control). Mike Morgan discussed this proposal with New Horizon 2 Mine staff:and <br />Brock Bowles of DRMS, and they understood the problem of trying to farm the half acre strip <br />equally with the rest of the reclaimed land. Since State Law requires reclaimed land be tilled <br />and irrigated equally, please approve our request to not put topsoil on the BB Detour Road <br />west of Pond 011 until Pond 011 is reclaimed. <br />In addition, we request our bench 1 soil from BB Detour Road be stockpiled by Pond 011 <br />because, the bench 1 soil will be used to reclaim Pond 011. Mike Morgan discussed this <br />request with the mine's staff (but not Brock Bowles) and the staff likes the idea because less <br />haulage is involved. Please call meat 97.0- 417 -8151 with your approval. Thank you. <br />Sinc rely <br />JoEllen Turner Frank Morgan organ Mary ou Morgan <br />20150417 Morgan Request to DRMS on BB Detour Road Topsoil <br />
The URL can be used to link to this page
Your browser does not support the video tag.